sales@asktek.net+91 98408 99559044-45034080
AI-powered apparel ERP for the apparel industryPartner with usCareers

Glossary

Garment industry glossary

34 terms every merchandiser, planner and factory manager uses, explained in plain words with formulas and examples.

A

  • Apparel ERP

    Apparel ERP is enterprise resource planning software built for garment businesses, connecting orders, costing, materials, production, quality, shipping and accounts in one system.

  • Apparel PLM

    Apparel PLM (product lifecycle management) is software that manages a style from concept to production: specifications, materials, samples, costs and approvals.

  • AQL (acceptable quality limit)

    AQL is the highest number of defective units a buyer will accept in a random sample before rejecting the whole lot, based on the ISO 2859-1 sampling tables.

B

  • BOM (bill of materials)

    A bill of materials lists every material and trim needed to make a garment, with quantities per piece, so the whole order's purchase requirement can be calculated.

  • Bottleneck

    A bottleneck is the operation or station on a line with the lowest output, which limits the output of the whole line.

  • Buying house

    A buying house is a sourcing company that finds, manages and inspects factories on behalf of overseas buyers, earning a commission or a trading margin.

C

  • CMT (cut, make, trim)

    CMT is a manufacturing arrangement where the buyer supplies the fabric and the factory charges only for cutting, sewing and trimming the garments.

  • Commercial invoice

    A commercial invoice is the seller's bill to the overseas buyer and the main customs document for an export shipment, stating goods, quantities, prices, terms and parties.

  • Costing sheet

    A garment costing sheet adds up fabric, trims, CMT, washing or processes, overheads, freight and margin to arrive at the price quoted to the buyer.

  • Cut-to-pack ratio

    Cut-to-pack ratio is the number of garments packed divided by the number cut, shown as a percentage, and measures losses between cutting and shipment.

E

  • Ex-factory date

    The ex-factory date is the date the finished, packed goods must leave the factory for shipment, as agreed with the buyer.

F

  • Fabric consumption

    Fabric consumption is the quantity of fabric needed per garment, in metres, yards or kilograms, including allowances for shrinkage and wastage.

  • Final inspection

    Final inspection is the audit of finished, packed goods before shipment, normally done to the buyer's AQL, to decide whether the lot passes.

  • FOB (free on board)

    FOB is an Incoterm under which the seller pays to deliver goods onto the vessel at the named port, and the buyer takes on cost and risk from that point.

G

  • GSM (grams per square metre)

    GSM is the weight of a fabric in grams per square metre, used to specify knit fabrics and to calculate fabric consumption by weight.

I

  • Inline inspection

    Inline inspection checks garments during production, at the sewing line or after key operations, so defects are corrected before the whole order is made.

L

  • Lab dip

    A lab dip is a small swatch of fabric or yarn dyed to match the buyer's colour standard, sent for approval before bulk dyeing.

  • Line balancing

    Line balancing is the allocation of sewing operations to operators so that each station carries roughly the same workload and no single operation holds up the line.

  • Line efficiency

    Line efficiency is the standard minutes produced by a line divided by the minutes its operators were available, shown as a percentage.

M

  • Marker efficiency

    Marker efficiency is the share of the marker's fabric area actually used by pattern pieces, shown as a percentage.

O

  • Operation bulletin (OB)

    An operation bulletin lists every operation needed to sew a garment, in sequence, with the SMV, machine type and number of operators for each, so the line can be set up and targets calculated.

P

  • Packing list

    A packing list details how a shipment is packed: carton numbers, contents by style, colour and size, quantities, and net and gross weights.

  • PP sample (pre-production sample)

    A PP sample is made in the actual bulk fabric and trims, exactly as production will be made, and must be approved by the buyer before cutting starts.

  • PPC (production planning and control)

    PPC is the function that decides when and on which lines each order will be produced, then monitors actual progress and adjusts the plan.

  • Proto sample

    A proto sample is the first sample of a new style, made to check the design, fit and construction before the style is costed or confirmed.

S

  • Size set sample

    A size set is a set of samples in every size of the order, made to check grading and measurements across the size range before bulk production.

  • Skill matrix

    A skill matrix records which operations each operator can perform and how efficiently, so supervisors can allocate work and plan training.

  • SMV (standard minute value)

    SMV is the time, in minutes, that a trained operator working at a normal pace needs to complete one garment operation, including allowances for fatigue and personal needs.

  • Strike-off

    A strike-off is a sample of a print or embroidery on the actual fabric, submitted for buyer approval of colours and placement before bulk printing.

T

  • Tech pack

    A tech pack is the buyer's technical specification for a style: sketches, measurements, materials, trims, construction details, labels and packing instructions.

  • Time and action (T&A) calendar

    A time and action calendar lists every milestone a garment order must reach before shipment, with a planned date and the actual completion date for each.

  • Time study

    A time study measures how long an operation takes by observing a trained operator over several cycles, as the basis for calculating SMV.

  • Trims and accessories

    Trims are all the materials in a garment other than the main fabric: thread, buttons, zips, labels, tags, elastic, interlining and packing materials.

W

  • WIP (work in progress)

    WIP is the quantity of an order that has been started but not finished, for example cut but not yet sewn, or sewn but not yet packed.

See these terms working in TARGET 360

SMV, T&A, AQL and cut-to-pack are built into the software, not added on.